Dismantling and installation of equipment to be carried out in the UM underwater tunnel from 4 to 5 November

澳大河底隧道於本年11月4日至5日進行拆卸及安裝設備工作

Dear Colleagues and Students,

As informed by the Transport Bureau (DSAT), dismantling and installation of equipment will be carried out at the entrance of UM underwater tunnel (from UM to Taipa) during 4 to 5 November, from 09:30 to 17:00. During this period, there will be traffic control under assistance of the Police and the site shall be well equipped with traffic signs.

Thank you for your attention.

Best Regards,

Security and Facilities Services Section

各位同事及同學:

  根據交通事務局消息,澳大河底隧道往氹仔方向之出入口路段於本年11月4日及5日進行拆卸及安裝設備工作,時間為每日上午9時30分至下午5時。該路段將在設置適當交通標誌及警方協助的條件下實施有限度通車。

       敬希垂注!